Office Complexes/High Tech : Cal
Trans Headquarters - District 4 Structural Retrofit Studies
 |
 |
The Caltrans District 4 Headquarters
is a 15-story, steel moment-resisting frame building that provides office
space for approximately 2,000 Caltrans employees, a fleet of Caltrans
vehicles, and the Bay Area Transportation Management Center. Crosby Group,
teamed with Degenkolb Engineers, was retained to provide an initial study
to identify four possible upgrade schemes and implement the approved
scheme. Our solution includes strengthening 60% of the moment-resisting
frame connections and installing viscous dampers (energy dissipation
devices) in 115 bays. This scheme met the client's needs considering
cost, construction impact, staff disruptions, etc.
|
|
|