spacer
Stuctural Engineering And Design
Logo
Projects
Projects Photo
graphic
Commercial
Manufacturing/Processing Facilities
Office Complexes/High Tech
Community
Education
Essential Services
Health Care
Historic Preservation
International
Justice
Parking Garages
Seismic Retrofit
graphic
image
image image About Us image What's New image Projects image Principals image Contact Us image
image image image
Education
image
Office Complexes/High Tech : Cal Trans Headquarters - District 4 Structural Retrofit Studies

collage spacer
spacer   spacer
photo
1 graphic zoom in


The Caltrans District 4 Headquarters is a 15-story, steel moment-resisting frame building that provides office space for approximately 2,000 Caltrans employees, a fleet of Caltrans vehicles, and the Bay Area Transportation Management Center. Crosby Group, teamed with Degenkolb Engineers, was retained to provide an initial study to identify four possible upgrade schemes and implement the approved scheme. Our solution includes strengthening 60% of the moment-resisting frame connections and installing viscous dampers (energy dissipation devices) in 115 bays. This scheme met the client's needs considering cost, construction impact, staff disruptions, etc.



back




image image image

Copyright © 2002-2005 The Crosby Group. All Rights Reserved. Design by Global 1 Design.


image
image image image image image
image