

|
|

 |
 |
 |
 |
 |
Prisons/Jails : San Francisco Jail #3
 |
 |
Crosby Group is the structural designer for this 768-bed secured facility. This four-story jail is being built next to the existing San Francisco jail. We have included special design criteria because it is built within a mile of the San Andreas Fault. This will ensure the site remains operational after a seismic event.
|
|
 |
 |
 |
Copyright © The Crosby Group. All Rights Reserved. |
|
|