![spacer](images/spacer.gif)
![Stuctural Engineering And Design](images/SED_internal.gif)
|
|
![image](images/spacer.gif)
![image](images/spacer.gif) |
![image](images/spacer.gif) |
![image](images/spacer.gif) |
Libraries : DeAnza Community College Learning Resource Center |
![image](images/spacer.gif) |
![collage](images/project_img/collage_libraries2.gif) |
![spacer](images/spacer.gif) |
Crosby Group performed a seismic evaluation and renovation of an existing 2-story Learning Center
and provided a complete structural design of a new 3-story addition. This $5 Million project
included a two-story pedestrian bridge to link the buildings and a revised moment frame design.
In addition, Crosby Group addressed life-safety issues and successfully gained approval from the
California Division of the State Architect (DSA).
LOCATION: Cupertino, CA
CONSTRUCTION COST: $5 Million
COMPLETED: 1996
OWNER: Foothill-DeAnza Community College District
HIGHLIGHTS:
DSA Compliant
Pedestrian Bridges
|
|
![image](images/spacer.gif) |
![image](images/spacer.gif) |
![image](images/spacer.gif) |
Copyright © The Crosby Group. All Rights Reserved. |
|
|