spacer
Stuctural Engineering And Design
Logo
Projects
Projects Photo
graphic
Commercial
Community
Education
Essential Services
Health Care
Historic Preservation
International
Justice
Parking Garages
Seismic Retrofit
Federal
Peer Review
graphic
image
image image About Us image What's New image Projects image Principals image Contact Us image
image image image
Education
Coalinga State Psychiatric Hospital
image
collage spacer
spacer   spacer
photo
1  2  3 graphic zoom in


Crosby Group priovided structural design for this OSHPD-compliant 1500-bed secured facility, which is the largest of its kind in the California state hospital system. The campus includes 48 unique and challenging buildings and costs an estimated $325 million to build. Various structural systems were chosen so that considerations such as security, flexibility, aesthetics, and budget could be addressed on a building-per-building basis.

Our design included the formation of a separate satellite office and initiated extensive working sessions with all members of the design team to ensure both quality and coordinated design efforts. This project was a collaborative effort between the California Departments of Mental Health, General Services, and Corrections.

LOCATION:
Coalinga, CA

CONSTRUCTION COST:
$325 Million

COMPLETED:
2005

OWNER:
State of California

HIGHLIGHTS:
OSHPD-Compliant
48 Unique Structures


back


image image image

Copyright © The Crosby Group. All Rights Reserved.


image
image image image image image
image