	  ACM Aviation Hangar & Parking Garage |  
	    |  
	  
	  	
		
		
			
				  | 
				  | 
				
					
					
  
                  Crosby Group provided structural
                  engineering for this project at the San Jose International
                  Airport that includes a new concrete four-story parking garage
                  consisting of two independent structures making up about 250
                  spaces. We provided design of the foundation system and floor
                  slab with spread footing to maintain stability for the aircraft
                  hangar that will be used for maintenance and storage. The executive
                  terminal is a two-story steel framed building that will serve
                  ACM Aviation clients more effectively. The entire project is
                  a sustainable/green project that exceeds local and state standards
                  and provides enhanced seismic performance. 
                
LOCATION: San Jose, CA 
 
CONSTRUCTION COST: $30 Million 
 
COMPLETED: 2006 
 
OWNER: Tectonic Management Group 
 
HIGHLIGHTS: 
Long-Span Design 
Immediate Occupancy 
Sustainable Design 
 
					 
					 
					 
                 | 
			 
		 
		 | 
	   
	   
	  
	  
		
  
		
         
		    | 
		    | 
		    | 
		 