 |
 |
Crosby Group is providing complete structural engineering for this
library, administration building, reading hall, auditorium, and parking
garage. The administration building and 52,000s.f. library are two-story
structures. The library includes skylights, and the 10,000s.f. auditorium
includes high ceilings with stage and seating areas. Pedestrian bridges
connect the buildings. The one-story parking garage is a 59,500s.f cast-in-place
concrete underground structure.
|
|