ACM Aviation Hanger & Parking Garage |
|
|
|
Crosby Group provided structural
engineering for this project at the San Jose International
Airport that includes a new concrete four-story parking garage
consisting of two independent structures making up about 250
spaces. We provided design of the foundation system and floor
slab with spread footing to maintain stability for the aircraft
hangar that will be used for maintenance and storage. The executive
terminal is a two-story steel framed building that will serve
ACM Aviation clients more effectively. The entire project is
a sustainable/green project that exceeds local and state standards
and provides enhanced seismic performance.
LOCATION: San Jose, CA
CONSTRUCTION COST: $30 Million
COMPLETED: 2006
OWNER: Tectonic Management Group
HIGHLIGHTS:
Long-Span Design
Immediate Occupancy
Sustainable Design
|
|
|
|
|