spacer
Stuctural Engineering And Design
Logo
About Us
About Us Photo
graphic
Overview
Careers
Design-Build
Mission Critical
International Work
LEED
Research & Testing
Revit/BIM
graphic
image
image image About Us image What's New image Projects image Principals image Contact Us image
image image image
Design-Build Capabilities
image

Crosby Group differentiates itself from other engineers on design-build teams by understanding the cost impacts of multiple trades, structural systems, and present day material costs. We have been able to bring real solutions that contractor’s appreciate. Patrick Crosby, S.E. has been involved with helping shape the evolution of the design build delivery method through his active participation in the Design-Build Institute of America, becoming credentialed as a Designated Design-Build Professional in 2007. He has stayed involved with DBIA serving on the BIM committee and was recently elected to the DBIA Board of Directors where he serves as advocate for the design-build process.

With our design-build experience and in-house expertise, Crosby Group can successfully navigate the challenges of the design-build process and is committed to teamwork to deliver projects that not only meet the client’s needs, but meet the construction metrics of being on time, on schedule and within budget.

AFTACUS SouthComSLAC SUSBSJC Admin BldgUCI Humanities
SMC CEDARSkyline College Admin/CosmetologySan Quentin CHSBSouth Placer Co. ADFMule Creek Infill Complex

Our recent Design-Build work includes:

AWARDS:

The Crosby Group has been fortunate to have been an integral participant on many significant projects and has received numerous awards.
TESTIMONIALS:

"The solution Crosby presented was critical to helping the Clark/McCarthy team win the contract (California Healthcare Facility). Finding a way to get structural steel started very early increased the probability their team could meet our tight project schedule. Crosby has a lot of design build experience so they have a clear appreciation and understanding of what the client's expectations are for a design-builder and how to meet them."

Michael Meredith, Project Director
California Department of Corrections and Rehabilitation
Project: California Healthcare Facility, Stockton, CA


"To meet the fast-track completion schedule, Crosby Group had to hit the ground running with their structural design, which they did. In a key way, that helps with cost-effectiveness: By getting their design documents completed and approved on time, they made it possible for project managers to get steel fabricated and delivered to meet the aggressive schedule."

Dennis Newell, Resident Engineer
U.S. Army Corps of Engineers
Project: U.S. Southern Command Headquarters


"We found the Crosby Group to be very responsive in working with our firm and the other team members on this major design-build project, the largest ever awarded by the Federal Bureau of Prisons. They were very knowledgeable of building systems and were able to work with our subcontractors to provide systems that were the most cost-effective, commercially available and most importantly, constructible. They had a “do-whatever-it-takes” attitude and worked as hard as the contractor team members in order to complete the project over a month ahead of the contractual completion date. The combined partnering effort of all of the team members, including the Crosby Group, led to the project being awarded the Associated General Contractors’ (AGC) of America 2004 Marvin M. Black Excellence in Partnering Award."

Steve M. Grauer, Operations Manager
Hensel Phelps Construction Co.
Project: United States Penitentiary & Federal Correctional Institute



image image image

Copyright © The Crosby Group. All Rights Reserved.


image
image image image image image
image